Synchronous area and LFC block operational agreements |
|
|
Regulation Article |
SO GL article 184.2 SO GL article 184.3 |
|
Regulation text |
Art. 184.2: “All TSOs of each synchronous area shall notify the contents of their synchronous area operational agreement to ENTSO for Electricity for publication no later than 1 week after its entry into force.” Art. 184.3: “Each TSO of each LFC block shall share the contents of its LFC block operational agreement with its regulatory authority or, where applicable, with another competent authority.” |
|
Detailed description |
Proposed implementation approach to satisfy this article and the other methodology publication requirements is for each SA to publish its SAOA and optionally for each LFC-Block to publish its LFCBOA |
|
Specification of calculation |
No calculations foreseen on the transparency platform. The following metadata shall be published together with the SAOA (and the LFCBOA, when applicable): − Synchronous Area − LFC Block (when applicable) − status [proposed/rejected with comments/revised proposal/NRA approved] − Entry-into-Force date (where known) − Version number |
|
Primary owner of the data |
All TSOs of each synchronous area |
|
Data provider |
The SAOA methodology texts relevant to each synchronous area will be published by the Synchronous Area Monitor of each Synchronous Area. Voluntary publication of the LFCBOA documents relevant to meeting other publication requirements may be performed by each LFC Block Monitor. |
|
Aggregation |
|
|
Publication deadline for ENTSO-E |
no later than 1 week after entry into force of the synchronous area operational agreements. |
|
Updates |
Updates shall be published no later than 1 week after the entry into force of the updated SAOA or LFCBOA. Any revisions to the SAOA or LFCBOA which will follow the SO GL shall also be published. |
|
Comments |
Some Synchronous Areas and some LFC Blocks may not produce methods associated with articles 118 and 119. |
Comments