| Installed Generation Capacity aggregated | ||
| Regulation Article | TR articles 14.1.a and 14.2.a | |
| Regulation text | For their control area, TSOs shall calculate and provide the sum of generation capacity (MW) installed for all existing production units equaling to or exceeding 1 MW installed generation capacity, per production type, The information shall be published annually no later than one week before the end of the year. | |
| Detailed description | The sum of installed Net generation capacity (MW) per control area for all existing production units per production type. By default the 1MW threshold is not applicable. If a TSO applies the threshold of 1 MW, a disclaimer text should be put on the publication page. The information shall be published annually no later than one week before the end of the previous year. The installed net generation capacity refers to the generation capacity which is effectively installed on January 1st of the following year. | |
| Specification of calculation | Installed generation capacity should refer to the 1st January of the following year. The data are aggregated per control are and per production type. | |
| Primary owner of the data | Owners of production units and /or DSO | |
| Data provider | TSOs or other Data Provider of information depending on local organisation. | |
| Aggregation | Locally (in Data provider) | |
| Publication deadline for ENTSO-E | One week before the first year to which the data refers. | |
| Updates | None | |