| Code | Meaning |
| A09 | Finalized schedule |
| A11 | Aggregated energy data report |
| A15 | Acquiring system operator reserve schedule |
| A24 | Bid document |
| A25 | Allocation result document |
| A26 | Capacity document |
| A31 | Agreed capacity |
| A37 | Reserve bid document |
| A38 | Reserve allocation result document |
| A44 | Price Document |
| A61 | Estimated Net Transfer Capacity |
| A63 | Redispatch notice |
| A65 | System total load |
| A68 | Installed generation per type |
| A69 | Wind and solar forecast |
| A70 | Load forecast margin |
| A71 | Generation forecast |
| A72 | Reservoir filling information |
| A73 | Actual generation |
| A74 | Wind and solar generation |
| A75 | Actual generation per type |
| A76 | Load unavailability |
| A77 | Production unavailability |
| A78 | Transmission unavailability |
| A79 | Offshore grid infrastructure unavailability |
| A80 | Generation unavailability |
| A81 | Contracted reserves |
| A82 | Accepted offers |
| A83 | Activated balancing quantities |
| A84 | Activated balancing prices |
| A85 | Imbalance prices |
| A86 | Imbalance volume |
| A87 | Financial situation |
| A88 | Cross border balancing |
| A89 | Contracted reserve prices |
| A90 | Interconnection network expansion |
| A91 | Counter trade notice |
| A92 | Congestion costs |
| A93 | DC link capacity |
| A94 | Non EU allocations |
| A95 | Configuration document |
| B11 | Flow-based allocations |
| B17 | Aggregated netted external TSO schedule document |
| B45 | Bid Availability Document |