| Report on developments | |
| Regulation Article | TR article 9.1 |
| Regulation text | TSOs shall establish and provide information on future changes to network elements and interconnector projects including expansion or dismantling in their transmission grids within the next three years, to the ENTSO for Electricity. This information shall only be given for measures expected to have an impact of at least 100 MW on cross zonal capacity between bidding zones or on profiles at least during one market time unit. The information shall include: (a) the identification of the assets concerned; The information shall be published one week before the yearly capacity allocation but no later than the 15th calendar day of the month before the year to which the allocation relates. The information shall be updated with relevant changes before the end of March, the end of June and the end of September of the year to which the allocation relates. |
| Detailed description | Annually, the list of expansion and dismantling projects in national transmission grid per bidding zone with the estimated impact (MW) on the interconnection capacity for the next three following years. This information has to be given only for projects with a relevant effect on transfer capability between bidding zones (including technical profiles). A relevant effect is considered to be an effect that equals or exceeds 100 MW at least during one market time unit. Each project - internal network component or interconnector - will be described by the following identification characteristics:
The information shall be published one week before the yearly capacity allocation but no later than the 15th calendar day of the month before the year to which the allocation relates. E.g. submission in December of year Y (2015) for a publication scope equal to year Y+1 (2016), year Y+2 (2017) and Y+3 (2018). The information shall be updated with relevant changes before the end of March, the end of June and the end of September of the year to which the allocation relates. A template for the submission of the information requested by TR article 9.1 is available in the attachment of the Manual of Procedure. |
| Specification of calculation | |
| Primary owner of the data | TSO |
| Data provider | TSO(s) |
| Aggregation | The report could be coordinated at an ENTSO-E level. |
| Publication deadline for ENTSO-E | One week before the gate closure of the yearly capacity auction but no later than the 15th calendar day of the month before the year which the auction relates to. |
| Updates | To be updated with relevant changes before end of March, end of June and end of September of year Y. |