Flow-based parameters |
|
|
Regulation Article |
TR article 11.1.b |
|
Regulation text |
For their control areas TSOs or, if applicable, transmission capacity allocators, shall calculate and provide the following information to the ENTSO for Electricity sufficiently in advance of the allocation process: the relevant flow-based parameters in case of flow-based capacity allocation. |
|
Detailed description |
the relevant flow-based parameters |
|
Specification of calculation |
|
|
Primary owner of the data |
TSO |
|
Data provider |
TSO, Transmission Capacity Allocator (TCA) or Coordinated Capacity Calculators (CCC) on behalf of TSOs |
|
Aggregation |
Not applicable |
|
Publication deadline for ENTSO-E |
One hour before spot market gate closure |
|
Updates |
|